Advanced Scheduling
The mechanism of Advanced Scheduling gives a lot of useful possibilities that will improve the work process.
It allows to give a name for each backup on schedule you set. Press Add button and new schedule appears. You can enter a special (easy for you) name or keep it standard (ex.g. Schedule-1, Schedule-2, Schedule-3, …, Schedule-n).

As before you are able to specify time and days convenient for you, to select necessary plugins:

And also you can choose and set necessary pre-/post- backup action separately for each plugin. To set desired backup action you should enable pre-/post- backup functionality with a check-mark and choose necessary script in the expanded field. To learn more about Scripts creation please follow this link this link.

All added information is saved and displays in the main table on Schedule tab (on Settings window). Just pay attention to the most important fact that backup on schedule stays inactive and will not start in the specified time till the moment it is selected with a check-mark in the main table of scheduling.

You can also start backup without waiting for time specified. You should just select necessary schedule and press Start Backup button.

In case one of the schedules loses its necessity you can easily remove it by pressing an appropriate button.

| Functions and Features | ||
|---|---|---|
| Backup | 2-Tier Backup • Advanced Scheduling • Pre-/Post-Backup Scripts | Microsoft Exchange • Microsoft SharePoint • Microsoft SQL Databases • Oracle Databases • VMware Virtual Machines |
| Restore | LocalSpeedVault • Restore Cache • Restore on Desktop • VMware Per File Restore | |
| Management | Audit • Color Coding • Console • Remote Commands • Remote Installation • Saved Connections • Users | |
| Other | Archiving • Bandwidth Throttling • Branding and Deep Branding • Common Files • Virtual Drive | |